Services

The existing utility service connections to the Site were designed to service a major process plant and are likely to be different in nature to the needs of a future redevelopment. Aside from the exclusions identified in the demolition section (below), the Site is currently being demolished to slab level and the programme of works is due to be completed by the end of 2018.

Please note the highlighted Utility Services Constraints and Connection plan dated June 2018.

Gas →
Utilities Plan