Water

Mains water is supplied by South East Water (SEW). The connection from the 200 dia DI main, indicated in blue on the adjacent plan, running south along College Road from New Hythe Lane as far as the factory main entrance, is currently maintained to supply the offices.

The Site also benefits from a system of bore-wells that is still technically capable and licenced for water abstraction (as per details in the data room), although there is currently no permit for waste water discharge in place.

← Telecoms Foul and Surface Water Drainage →
Utilities Plan